Project

Bering 165 (hull 1)

Bering 165 (hull 1) is a 49.4 m new build project; delivery 2029; design by Exterior: Valentin Design; Engineering: Eureka Yachts; General arrangement: Aberton Yachts.

Type
New build
Stage
In build
Length
49.4 m
Delivery
2029
Design
Exterior: Valentin Design; Engineering: Eureka Yachts; General arrangement: Aberton Yachts

Bering Yachts laid the keel of the first 49.4 m Bering 165, the largest model of its new Superyacht division. Delivery is scheduled for 2029.

Follow the yachting world as it happens with the Yacht Vector app.

Coming soon · App Store · Google Play