Project
Bering 165 (hull 1)
Bering 165 (hull 1) is a 49.4 m new build project; delivery 2029; design by Exterior: Valentin Design; Engineering: Eureka Yachts; General arrangement: Aberton Yachts.
- Type
- New build
- Stage
- In build
- Length
- 49.4 m
- Delivery
- 2029
- Design
- Exterior: Valentin Design; Engineering: Eureka Yachts; General arrangement: Aberton Yachts
Bering Yachts laid the keel of the first 49.4 m Bering 165, the largest model of its new Superyacht division. Delivery is scheduled for 2029.